Duta Marine LNG Project

Duta Marine LNG Project

Instrumentation & Cryogenic Valve Package Supply for LNG Facility in Malaysia
Message

Project Facts

ItemDetails
ProjectDuta Marine LNG Project
Project TypeLNG Facility
CountryMalaysia
Project LocationWest Malaysia
IndustryLNG & Marine Energy
End UserDuta Marine
EPC ScopeInstrumentation & Valve Package
Products SuppliedPressure, Temperature, Flow Instruments & Industrial Valves
ApplicationLNG Receiving, Storage & Distribution
StandardsIEC / ATEX / Cryogenic Service
MaterialSS316 / SS316L
Delivery StatusCompleted

1. Project Overview

The project involved the supply of instrumentation and industrial valves for a marine LNG facility in Malaysia, supporting LNG receiving, storage, and distribution operations.

Anhui Tiankang Group, in collaboration with Anhui Hongji Instrument & Valve Co., Ltd., served as the instrumentation and valve package supplier for this marine energy infrastructure project. Our solutions were deployed across the LNG receiving, storage, and transfer systems. The supplied package supported reliable process monitoring and safe operation under demanding LNG service conditions.


2. Scope of Supply

We delivered a comprehensive instrumentation and valve package tailored to the specific requirements of the LNG facility.

Instrumentation

CategoryProducts
Pressure TransmittersGauge, Absolute, and Differential types for LNG storage and pipeline pressure monitoring
Temperature SensorsRTD Pt100 and Thermocouple Type K for cryogenic and ambient process zones
Flow InstrumentsFlow measurement devices for LNG transfer and utility systems

Valves

CategoryProducts
Control ValvesPneumatic and electric actuated for process regulation
Globe ValvesFor isolation and throttling applications
Gate ValvesFor various process and utility services
Ball ValvesFor various process and utility services
Butterfly ValvesFor various process and utility services
Cryogenic Ball ValvesSS316L extended bonnet type for cryogenic service

Documentation

CategoryProducts
MTCMaterial Test Certificates
FAT ReportsFactory Acceptance Test Reports
Calibration CertificatesInstrument calibration documentation
Ex CertificatesExplosion-proof certification (where applicable)
Installation ManualsSite installation and maintenance guides

3. Technical Requirements

The LNG project demanded strict adherence to international engineering standards and industry best practices due to the hazardous nature of LNG handling and the critical safety requirements of marine energy facilities. The key technical requirements included:

  • Cryogenic Service Capability: All wetted components and valves were required to maintain structural integrity and sealing performance at LNG temperatures (approximately -162°C).

  • Low Temperature Material Compatibility: All materials were selected to prevent brittle fracture and ensure mechanical integrity under cryogenic service conditions.

  • Hazardous Area Compliance: Installation in classified areas required equipment with appropriate Ex certification for potentially explosive atmospheres.

  • Marine Environment Corrosion Resistance: Equipment must withstand high humidity, salt spray, and corrosive marine atmospheric conditions, necessitating stainless steel and coated housings.

  • Leakage Integrity: Strict fugitive emission requirements for all valves to ensure zero leakage and environmental compliance.

  • Reliability & Long-term Stability: Measurement and control equipment were required to maintain accuracy and repeatability over extended service intervals with minimal maintenance.

  • Control System Compatibility: All field instruments were supplied with standard output signals and communication protocols required by the client's control systems.


4. Engineering Solution

Our engineering approach was based on the client's P&IDs, instrument datasheets and I/O requirements. Beyond material supply, our engineering team provided comprehensive technical support throughout the project lifecycle:

  • Cryogenic Application Selection: We selected pressure transmitters and temperature sensors with appropriate wetted materials and process connections specifically designed for LNG cryogenic service, ensuring accurate measurement and long-term reliability at extreme low temperatures.

  • Valve Sizing & Actuator Selection: Control valves were sized based on actual process conditions (pressure, temperature, flow rates, and media characteristics) provided by the EPC team. Actuators were selected with appropriate fail-safe positions as per the client's safety philosophy.

  • Cryogenic Valve Engineering: For ball and gate valves installed in cryogenic zones, we ensured extended bonnet designs and proper material selection (austenitic stainless steels) to maintain stem seal integrity and prevent ice formation.

  • Material Traceability: All valve bodies and instrument wetted parts were supplied with full material test certificates (MTCs), ensuring complete traceability from mill to installation.


5. Key Challenges & Solutions

Challenge 1: Cryogenic Operating Conditions
The LNG facility required equipment capable of continuous operation at cryogenic temperatures (-162°C), where standard instrumentation and valve designs are prone to material embrittlement, seal failure, and measurement inaccuracies.

Solution: All instruments and valves destined for cryogenic service were selected with materials specifically rated for LNG temperatures (including 316/316L stainless steel bodies and internals). Valves were provided with extended bonnet designs to maintain packing temperature above the frost line, ensuring reliable stem sealing and leak-free operation.

Challenge 2: Rigorous Quality Assurance & Inspection Requirements
Duta Marine and its appointed third-party inspection agencies required stringent Factory Acceptance Tests (FAT) and on-site verification to ensure that every delivered item met specifications without exception.

Solution: Prior to shipment, we conducted comprehensive FAT protocols on all instruments and valves, including pressure testing, leakage testing, calibration verification, and functional testing of actuators and positioners. All test reports were compiled and submitted with the final documentation package. Upon arrival in Malaysia, all delivered materials met the project inspection requirements and were accepted for installation.

Challenge 3: Tight Delivery Schedule
The LNG project operated on a strict construction timeline, with any material delivery delays potentially impacting downstream installation and commissioning activities.

Solution: We implemented a phased delivery plan aligned with Duta Marine's construction schedule. Dedicated production slots were allocated to ensure timely manufacturing, and logistics were coordinated to ensure just-in-time arrival at the Malaysia site. All deliveries were completed on schedule, enabling uninterrupted installation and commissioning.


6. Project Execution

Execution was driven by strict adherence to the EPC master timeline and Duta Marine's quality requirements. Anhui Tiankang Group, together with Anhui Hongji Instrument & Valve Co., Ltd., established a dedicated project management team to handle order processing, manufacturing, quality control, and logistics.

  • Phased Delivery: Materials were dispatched in batches corresponding to the installation schedule, ensuring that on-site inventory was managed efficiently without congestion or storage delays.

  • Documentation & Compliance: Every shipment was accompanied by comprehensive technical documentation, including material test certificates (MTCs), calibration reports, FAT reports, pressure test certificates, Ex certificates (where applicable), and installation manuals.

  • Third-Party Inspection: Equipment was verified by third-party inspection agencies appointed by Duta Marine upon arrival in Malaysia. All items met the inspection criteria and were accepted for installation, demonstrating the consistency and reliability of our quality control processes.

  • Installation Support: Our project team remained available for technical consultation during installation, ensuring that any on-site questions were resolved promptly.


7. Application Areas

The instrumentation and valve package supplied to Duta Marine's LNG project is utilized across the following critical process domains:

  • LNG Receiving and Unloading Systems (pressure monitoring, flow measurement, and emergency shutdown valves)

  • LNG Storage Tanks (level measurement, pressure monitoring, and tank isolation valves)

  • LNG Transfer and Pipeline Systems (flow and pressure control)

  • Boil-off Gas (BOG) Handling Systems (temperature and pressure measurement, control valves)

  • Utility Systems (instrument air, nitrogen, and cooling water systems)

  • Fire and Gas Detection Support Infrastructure


8. Products Supplied

ProductModel/Series
Pressure TransmitterTK3051 Series (CD/CG/CA)
Temperature SensorWZP Series RTD (Pt100)
Control ValvePneumatic Globe Valve
Cryogenic Ball ValveSS316L Extended Bonnet Type

9. Project Outcome

The instrumentation and valve supply for Duta Marine's LNG project was executed successfully, meeting all quality and delivery requirements.

All supplied equipment met the project inspection requirements and was accepted for installation upon arrival in Malaysia. The entire delivery schedule was completed on schedule, enabling the project team to proceed with installation and commissioning without interruption.

The supplied instruments and valves performed in accordance with project requirements during installation and commissioning activities, supporting the successful startup of the facility.

The successful completion of this project further strengthened our experience in supplying instrumentation and industrial valves for LNG and marine energy applications.


10. Planning an LNG or Marine Energy Project? Talk to Our Engineering Team

From individual instruments to complete instrumentation and valve packages, we support EPC contractors and end users with reliable engineering solutions for LNG and energy infrastructure projects.

Whether you are developing an LNG receiving terminal, a petrochemical complex, or a marine energy facility, we offer end‑to‑end instrumentation and valve solutions that reduce your vendor management burden and ensure compliance with international standards.

We provide complete solutions for:

  • ✔ LNG Terminals and Receiving Stations

  • ✔ Oil & Gas Refineries and Petrochemicals

  • ✔ Marine and Offshore Facilities

  • ✔ Chemical & Fertilizer Plants

  • ✔ Power Generation Stations

  • ✔ Storage Tank Farms and Pipeline Systems

Contact Our Engineering Team

For direct inquiries and fast technical support, please reach out to our project representative:

Yin Shuangjie
International Sales Manager
📧 Email: [email protected]
📱 WhatsApp / Zalo: +86 17856068126
🌐 Website: www.tiankang-global.com

We are ready to assist you with:

  • ✅ Technical consultation and instrument selection based on process data and P&ID review

  • ✅ Valve sizing and actuation engineering

  • ✅ Cryogenic and special-service product selection

  • ✅ Full EPC technical documentation and I/O wiring assistance

  • ✅ Factory Acceptance Testing (FAT) and third-party inspection coordination

  • ✅ Fast commercial quotation – typically within 24 hours

Contact us today by email or WhatsApp, or visit our website to request your custom technical proposal.
We look forward to supporting your next project!


The information presented in this case study is for reference only and is based on project delivery records and publicly available sources.