Bangladesh S. Alam 2×660MW Coal-Fired Power Plant Instrumentation Package

Bangladesh S. Alam 2×660MW Coal-Fired Power Plant Instrumentation Package

Anhui Tiankang supplied pressure gauges and industrial thermometers for the Bangladesh S. Alam 2×660MW coal-fired power plant EPC project, supporting seawater desalination and boiler feedwater systems with complete instrumentation documentation.
Message

Pressure Gauges & Industrial Thermometers for Water Treatment Systems

Anhui Tiankang supplied pressure gauges, industrial thermometers and instrumentation accessories for the seawater desalination and boiler feedwater systems of the Bangladesh S. Alam 2×660MW coal-fired power plant EPC project, supporting water treatment process monitoring with engineered supply and complete EPC documentation.

Project Facts

ItemDetails
ProjectBangladesh S. Alam (Banshkhali) 2×660MW Coal-Fired Power Plant
Project TypeUltra-Supercritical Coal-Fired Power Plant (BOO Model)
CountryBangladesh
Project LocationBanshkhali, Chittagong, Bangladesh
Project OwnerS. Alam Group (Bangladesh)
EPC Contractor & InvestorSEPCOIII Electric Power Construction Corporation
ApplicationSeawater Desalination, Boiler Feedwater Treatment, Auxiliary Process Instrumentation
Installed Capacity2×660MW (total 1,320MW)
Annual GenerationApprox. 10 billion kWh
Cooling TechnologySeawater DC Cooling
DesulfurizationSeawater Desulfurization
IndustryPower Generation / Thermal Power
Scope of SupplyInstrumentation Package (Pressure Gauges, Industrial Thermometers, Accessories)
Supply ValueApprox. RMB 2.45 million (Instrumentation Package)
Supply DateAugust 2020
Project StatusCompleted (FAC Issued)
DocumentationDatasheets / Calibration Certificates / MTC
Client TypeEPC Project Supply Chain Partner

Project Challenges

  • Seawater desalination system instrumentation — seawater applications require suitable instrument materials and wetted parts to withstand high salinity and marine environmental conditions

  • Boiler feedwater treatment monitoring — precise pressure and temperature measurement is essential for maintaining water quality parameters and ensuring stable boiler feedwater supply

  • Continuous operation requirements — instrumentation installed in auxiliary systems must provide reliable measurement performance with minimal maintenance requirements

  • Strict EPC documentation requirements — complete calibration certificates, material test certificates, and technical datasheets required for each instrument

  • Large-scale EPC project coordination — supply aligned with SEPCOIII's construction schedule as part of the water treatment system package

Project Keywords

Power Plant Instrumentation Package Supplier

Thermal Power Plant Instrumentation

Water Treatment Instrumentation

Seawater Desalination Instrumentation

EPC Instrumentation Supplier

Long Tail Applications:

  • Pressure Gauges for Power Plant Water Treatment

  • Industrial Thermometers for Desalination Systems

  • Instrumentation Supplier for EPC Projects

Scope of Supply

Engineered pressure and temperature measurement solutions for seawater desalination and water treatment systems:

  • Stainless steel pressure gauges for seawater desalination and water treatment systems, selected according to process pressure range and corrosion requirements

  • Industrial thermometers for process water and auxiliary systems, configured according to operating conditions

  • Instrument accessories related to installation and connection

  • Complete Engineering Documentation Package:

    • Instrument datasheets

    • Calibration certificates

    • Material Test Certificates (MTC)

    • Technical documents for EPC submission

Supply completed in accordance with EPC project schedule requirements.

1. Project Overview

Anhui Tiankang Group served as the instrumentation package supplier for the water treatment systems of the Bangladesh S. Alam 2×660MW coal-fired power plant EPC project, supporting the EPC supply chain of a large-scale ultra-supercritical power project with engineered pressure and temperature measurement solutions. Anhui Tiankang delivered pressure gauges, industrial thermometers, and instrumentation accessories in August 2020, providing reliable measurement throughout the seawater desalination and boiler feedwater treatment processes.

The project, located in Banshkhali, Chittagong, is owned by Bangladesh's S. Alam Group. On October 14, 2016, the project was jointly unveiled by the leaders of China and Bangladesh during the Chinese President's state visit. SEPCOIII serves as both the EPC contractor and a minority investor under the BOO model.

The project features two 660MW ultra-supercritical coal-fired units employing seawater DC cooling and seawater desulfurization technology. It is the largest single-unit capacity thermal power project in Bangladesh, with an annual generation capacity of approximately 10 billion kWh.

The plant successfully achieved commercial operation in 2023 — Unit 2 completed its 168-hour reliability trial run on September 17, 2023, 70 days ahead of schedule, and Unit 1 followed on October 22, 2023, 35 days ahead of schedule. The project received its Final Acceptance Certificate (FAC) on December 19, 2024.

2. Scope of Supply

Anhui Tiankang Group's instrumentation supply for this project included:

Pressure Instruments

  • Pressure gauges with suitable materials and wetted parts for seawater desalination and boiler feedwater systems

Temperature Instruments

  • Industrial thermometers for process water and auxiliary system monitoring

Accessories & Documentation

  • Instrument accessories related to installation and connection

  • Calibration certificates

  • Material test certificates (MTCs)

  • Datasheets and installation guides

3. Project Technology – Application Context

The following provides background on the project's process technology to help understand the instrumentation application environment.

3.1 Power Plant Auxiliary System Background

The project employs two 660MW ultra-supercritical coal-fired units, making it the largest single-unit capacity thermal power project in Bangladesh. The units feature advanced combustion and emissions control systems designed for efficient baseload operation.

3.2 Seawater Desalination System

The project includes a seawater desalination system to supply process water for the power plant. Seawater applications require suitable instrument materials and wetted parts to withstand high salinity and marine environmental conditions.

3.3 Boiler Feedwater Treatment

The boiler feedwater treatment system ensures high-purity water supply for the ultra-supercritical boiler operation. Precise pressure and temperature monitoring is essential for maintaining water quality parameters and ensuring stable feedwater supply.

3.4 Instrumentation Application Requirements

Instrumentation in seawater desalination and boiler feedwater systems must consider:

  • Corrosive seawater environment requiring suitable wetted materials

  • Stable pressure monitoring for pumps, filters and treatment equipment

  • Reliable temperature measurement for process control

  • Long-term operation under continuous power plant service conditions

  • Complete EPC documentation including datasheets, calibration certificates, and material test certificates

3.5 Seawater Cooling & Desulfurization

The plant employs seawater DC cooling and seawater desulfurization technology. Seawater is used both for condenser cooling and flue gas desulfurization, reducing freshwater consumption and environmental impact.

3.6 Project Standards & Equipment

The project adopted Chinese engineering standards and equipment solutions, demonstrating the capability of Chinese EPC contractors in delivering large-scale overseas power projects.

4. Engineering Solution

Our selection and supply were based on the water treatment system contractor's specifications, process conditions, and site requirements.

Pressure Measurement

Pressure gauges were selected with suitable materials and wetted parts for seawater desalination and process water applications, according to pressure range, corrosion conditions, and EPC specifications. Stainless steel construction was selected where required according to process conditions and corrosion considerations.

Temperature Measurement

Industrial thermometers were supplied with appropriate measuring ranges, insertion lengths, and connection types according to the specific requirements of the desalination and boiler feedwater systems.

Documentation & Quality Control

All instruments were delivered with complete calibration certificates, material test certificates (MTCs), and technical datasheets, ensuring full traceability and compliance with project requirements.

5. Project Execution

Execution followed the EPC contractor's project schedule and quality requirements. Anhui Tiankang Group established dedicated coordination to ensure alignment between supply and site installation.

  • On-Time Delivery: All instrumentation packages were delivered in August 2020, meeting the site installation schedule.

  • Quality Assurance: Instruments supplied with complete calibration certificates, MTCs, and technical documentation.

  • Documentation Package: Datasheets, calibration reports, and quality certificates accompanied all shipments.

  • Technical Support: Provided responsive consultation throughout the supply process.

6. Project Outcome

The Bangladesh S. Alam 2×660MW coal-fired power plant achieved Unit 2 commercial operation on September 17, 2023 (70 days ahead of schedule) and Unit 1 commercial operation on October 22, 2023 (35 days ahead of schedule). The project received its Final Acceptance Certificate (FAC) on December 19, 2024.

Key Results:

  • ✓ 100% of instrumentation delivered on schedule

  • ✓ Supplied instruments successfully completed site acceptance requirements

  • ✓ Complete documentation package provided

  • ✓ Project achieved commercial operation and FAC

Project Milestones

MilestoneDate
Joint Unveiling (China-Bangladesh Leaders)October 14, 2016
Unit 2 168-Hour Trial Run CompletedSeptember 17, 2023
Unit 1 168-Hour Trial Run CompletedOctober 22, 2023
Project FAC ReceivedDecember 19, 2024

During peak construction, the project created over 10,000 direct jobs and 40,000 indirect jobs. The plant serves as a landmark project under the Bangladesh-China-India-Myanmar Economic Corridor and has significantly alleviated Bangladesh's power shortage.

7. Project Performance Snapshot

MetricResult
Delivery Performance100% On-Time
DocumentationComplete
Site AcceptancePassed
Unit 2 CODSeptember 17, 2023
Unit 1 CODOctober 22, 2023
FAC ReceivedDecember 19, 2024
Project StatusCompleted
Operational StatusIn Service

8. Why Tiankang

  • ✔ Integrated instrumentation and cable supply capability — instrumentation, industrial cables and related accessories from one manufacturer

  • ✔ 30+ Years instrumentation manufacturing experience

  • ✔ In-house manufacturing capability for pressure and temperature instruments

  • ✔ Water treatment application expertise — instruments for seawater desalination, boiler feedwater, and process water systems

  • ✔ Complete EPC Instrumentation Package Capability — from individual instruments to full package supply

  • ✔ Engineering Documentation Support — customized datasheets, inspection documents, and export documentation for EPC projects

  • ✔ Factory Calibration & Inspection — before shipment

  • ✔ Global EPC Project Experience — proven track record across power generation, water treatment, and industrial sectors

  • ✔ Quality & Compliance Support — ISO 9001 manufacturing system and applicable product certifications for international EPC projects

9. Looking for an EPC Instrumentation Package Partner?

Whether you are bidding for a thermal power project, water treatment system, or industrial utility facility, our engineering team can help you prepare a complete instrumentation package based on your P&ID, instrument list, datasheets, and project specifications.

We support EPC contractors, system integrators, and industrial project owners worldwide with complete instrumentation packages from engineering selection, quotation support, documentation preparation to final delivery.

We provide complete solutions for:

  • ✔ Thermal Power Plants (Coal-Fired, Gas-Fired, Biomass)

  • ✔ Power Plant Auxiliary Systems

  • ✔ Water Treatment Systems (Desalination, Boiler Feedwater, Wastewater)

  • ✔ Cement Plants and WHR Projects

  • ✔ Oil & Gas Refineries and Petrochemicals

  • ✔ Large-Scale Tank Farm and Pipeline Projects

Contact Our Engineering Team

Yin Shuangjie
International Sales Manager
📧 Email: [email protected]
📱 WhatsApp / Zalo: +86 17856068126
🌐 Website: www.tiankang-global.com

Submit your instrument list or RFQ requirements, and our engineering team will provide a technical proposal and quotation.

We are ready to assist you with:

  • ✅ Instrument selection based on process conditions, P&ID, instrument list, and project specifications

  • ✅ Engineering support for water treatment applications, material selection, and connection types

  • ✅ Complete instrumentation package design and configuration

  • ✅ EPC technical documentation and compliance support

  • ✅ Fast engineering response — typical quotation turnaround within 24–48 hours


This case study is based on publicly available project information and Anhui Tiankang's supply records, and is provided for reference purposes only.