Dubai Noor Energy 1 CSP-PV Project Instrumentation Package

Dubai Noor Energy 1 CSP-PV Project Instrumentation Package

Anhui Tiankang supplied high-temperature level measurement instruments for the Dubai Noor Energy 1 700MW CSP + 250MW PV hybrid solar project EPC, supporting molten salt thermal energy storage up to 565°C with complete documentation.
Message

High-Temperature Level Measurement for Molten Salt Thermal Energy Storage

Anhui Tiankang supplied level measurement instruments and instrumentation accessories for the Dubai 700MW CSP + 250MW PV hybrid solar project, supporting molten salt thermal energy storage and steam system monitoring with engineered supply and complete EPC documentation.

Project Facts

ItemDetails
ProjectDubai Noor Energy 1 CSP + PV Hybrid Project
Project TypeConcentrated Solar Power & Photovoltaic Hybrid Project (IPP Model)
CountryUnited Arab Emirates
Project LocationMohammed bin Rashid Al Maktoum Solar Park, Phase 4, Dubai
Project Owner / InvestorsDEWA, ACWA Power, Silk Road Fund
EPC ContractorShanghai Electric Group Co., Ltd.
ApplicationMolten Salt Thermal Energy Storage, Steam System, Process Instrumentation
Installed Capacity950MW total (700MW CSP + 250MW PV)
CSP Configuration1×100MW Tower + 3×200MW Parabolic Trough
Tower Height260–262 meters
Thermal StorageTower: 15 hours; Trough (each): 13.5 hours
Molten Salt VolumeApprox. 550,000 tons of molten salt storage medium
Mirror Field AreaApprox. 8 million m²
LCOECSP: 7.3 USD cents/kWh; PV: 2.4 USD cents/kWh
IndustryRenewable Energy / Solar Power / Energy Infrastructure
Scope of SupplyInstrumentation Package (Level Measurement Instruments, Accessories)
Supply ValueApprox. RMB 4.31 million (Instrumentation Package)
Supply DateJuly 2020
Project StatusCompleted (Commercial Operation Achieved)
DocumentationDatasheets / Calibration Certificates / MTC
Client TypeEPC Project Supply Chain Partner

Project Challenges

  • Extreme molten salt service temperatures — thermal energy storage systems operate with molten salt at temperatures up to 565°C, requiring high-temperature level measurement instruments capable of withstanding extreme heat and corrosive conditions

  • Corrosive molten salt environment — molten nitrate salt requires carefully selected materials because long-term exposure at elevated temperatures may cause corrosion and material degradation

  • Long-duration thermal storage requirements — tower unit stores 15 hours of thermal energy; trough units store 13.5 hours each, requiring continuous reliable level measurement for inventory management and system control

  • Strict EPC documentation requirements — complete calibration certificates, material test certificates, and technical datasheets required for each instrument

  • Large-scale EPC project coordination — supply aligned with Shanghai Electric's construction schedule across multiple CSP units (1 tower + 3 troughs) and PV zones

Project Keywords

Molten Salt Level Measurement Supplier

Molten Salt Storage Instrumentation Supplier

CSP Power Plant Level Transmitter Supplier

CSP Instrumentation Package Supplier

Solar Thermal Power Plant Instrumentation

Thermal Energy Storage Instrumentation Supplier

Renewable Energy EPC Instrumentation Supplier China

Long Tail Applications:

  • Level Measurement for Molten Salt Thermal Storage

  • High-Temperature Level Instruments for CSP

  • Instrumentation for Molten Salt Storage Tank

  • Level Transmitter for Solar Thermal Power Plant

  • Instrumentation Supplier for Solar Power Projects

  • EPC Instrumentation Package for Renewable Energy

Scope of Supply

Complete level measurement package for molten salt thermal energy storage and steam systems:

  • High-temperature level measurement solutions including customized level instruments and assemblies for molten salt hot and cold tanks (service temperature up to 565°C)

  • Level measurement instruments for thermal oil and steam system applications

  • Installation accessories and mounting hardware

  • Complete Engineering Documentation Package:

    • Instrument datasheets

    • Calibration certificates

    • Material Test Certificates (MTC)

    • Technical documents for EPC submission

The supplied instruments were configured according to EPC specifications, process conditions and installation requirements.

Supply completed in accordance with EPC project schedule requirements.

1. Project Overview

Anhui Tiankang Group served as an instrumentation package supplier within the EPC supply chain for the Dubai Noor Energy 1 CSP + PV hybrid project, delivering level measurement instruments and instrumentation accessories in July 2020. Anhui Tiankang supported the EPC supply chain of one of the largest CSP-PV hybrid renewable energy projects globally with engineered level measurement solutions for molten salt thermal energy storage and steam systems.

The project, located in the Mohammed bin Rashid Al Maktoum Solar Park Phase 4 in Dubai, is one of the world's largest concentrated solar power projects and the largest CSP-PV hybrid facility globally. With a total investment of USD 4.4 billion, it is jointly invested by DEWA, ACWA Power, and the Silk Road Fund. Shanghai Electric Group serves as the sole EPC contractor, responsible for engineering, design, procurement, construction, erection, civil works, electrical, testing, and commissioning.

The 950MW project combines 700MW of CSP (1×100MW tower + 3×200MW trough) and 250MW of PV. The tower features a 260-262 meter central tower with 15 hours of thermal storage. Each trough unit provides 13.5 hours of storage. The plant utilizes approximately 550,000 tons of molten salt storage medium across its thermal energy storage systems, which is one of the largest molten salt thermal energy storage systems in the world.

This project represents a landmark deployment of large-scale CSP technology. Major plant systems became operational in December 2023, with commercial operation achieved by 2024. The project provides stable green power for 320,000 local households and reduces carbon dioxide emissions by more than 1.6 million tons annually.

2. Scope of Supply

Anhui Tiankang Group's instrumentation supply for this project included:

Level Measurement Instruments

  • High-temperature level measurement solutions including customized level instruments and assemblies for molten salt hot and cold tanks (service temperature up to 565°C)

  • Level measurement instruments for thermal oil and steam system applications

Accessories & Documentation

  • Instrument accessories related to installation and connection

  • Calibration certificates

  • Material test certificates (MTCs)

  • Datasheets and installation guides

3. Project Technology – Application Context

The following provides background on the project's process technology to help understand the instrumentation application environment.

3.1 Concentrated Solar Power Technology

The project employs a "tower + trough" hybrid CSP configuration. The 100MW tower unit uses a central receiver surrounded by heliostats that reflect and concentrate sunlight. The three 200MW trough units use parabolic mirrors to focus solar energy onto receiver tubes. This combination optimizes energy collection and dispatchability.

3.2 Molten Salt Thermal Energy Storage

The project features one of the world's largest molten salt thermal energy storage systems, with approximately 550,000 tons of molten salt storage medium. The tower unit stores 15 hours of thermal energy, while each trough unit stores 13.5 hours. Molten salt is heated to temperatures up to 565°C in the receiver and stored in hot tanks for continuous electricity generation during nighttime and cloudy conditions.

3.3 Instrumentation Application Requirements

Instrumentation in molten salt thermal energy storage systems must address critical challenges:

  • Extreme temperatures — molten salt service up to 565°C requires high-temperature level measurement instruments with specialized materials and designs capable of withstanding prolonged high-temperature exposure

  • Corrosive media — molten nitrate salt requires carefully selected materials because long-term exposure at elevated temperatures may cause corrosion and material degradation

  • Continuous operation — thermal storage systems operate 24/7; instruments must ensure reliable measurement with minimal maintenance

  • Inventory management — accurate level measurement is essential for managing molten salt inventory across hot and cold tanks to ensure dispatchable power generation

  • Complete EPC documentation — including datasheets, calibration certificates, and material test certificates

3.4 PV & Hybrid Integration

The 250MW PV component is distributed across unused locations within the 44 km² site for maximum land utilization. The hybrid design enables CSP to provide baseload and dispatchable power while PV contributes lower-cost daytime generation.

3.5 Project Significance

This project is one of the world's largest single-site CSP projects and the largest CSP-PV hybrid facility globally. It supports Dubai's Clean Energy Strategy to achieve 25% clean energy by 2030. For Shanghai Electric, it represents a flagship transition from traditional energy to renewable energy, demonstrating Chinese engineering standards and technology on a global stage.

4. Engineering Solution

Our selection and supply were based on Shanghai Electric's specifications, process conditions, and site requirements.

Level Measurement – Molten Salt Thermal Storage

High-temperature level measurement instruments were selected with specialized materials and designs to withstand molten salt service temperatures up to 565°C and corrosive conditions. Wetted parts and sensor designs were configured according to the specific requirements of hot tank and cold tank applications, ensuring reliable inventory measurement for thermal energy storage management.

Level Measurement – Thermal Oil & Steam Systems

Level measurement instruments were supplied for thermal oil and steam system applications according to process conditions, pressure ratings, and EPC specifications. Instruments were selected with appropriate materials and connection types for the CSP plant environment.

Documentation & Quality Control

All instruments were delivered with complete calibration certificates, material test certificates (MTCs), and technical datasheets, ensuring full traceability and compliance with project requirements.

5. Project Execution

Execution followed the EPC contractor's project schedule and quality requirements. Anhui Tiankang Group established dedicated coordination to ensure alignment between supply and site installation.

  • On-Time Delivery: All instrumentation packages were delivered in July 2020, meeting the site installation schedule.

  • Quality Assurance: Instruments supplied with complete calibration certificates, MTCs, and technical documentation.

  • Documentation Package: Datasheets, calibration reports, and quality certificates accompanied all shipments.

  • Technical Support: Provided responsive consultation throughout the supply process.

6. Project Outcome

The Dubai Noor Energy 1 CSP + PV hybrid project achieved major plant systems operation in December 2023, with commercial operation achieved by 2024. The project provides stable green power for 320,000 local households and reduces carbon dioxide emissions by more than 1.6 million tons annually.

Key Results:

  • ✓ 100% of instrumentation delivered on schedule

  • ✓ Supplied instruments successfully completed site acceptance requirements

  • ✓ Complete documentation package provided

  • ✓ Project achieved commercial operation

  • ✓ Recognized as a landmark renewable energy project

Project Milestones

MilestoneDate
Project Launch2018
PV Zone 1 (217MW) Commercial OperationDecember 2021
PV Zone 1 Preliminary AcceptanceJuly 2022
PT1 (Trough Unit 1) Grid ConnectionNovember 2022
Trough Unit 1 Commercial OperationDecember 2022
Project Inauguration (COP28)December 2023
PV Zone 2 (33MW) Commercial OperationFebruary 2024
PV Zone 1 FAC IssuedSeptember 2024
Major Systems Commercial Operation Achieved2024

The project was recognized internationally for its contribution to large-scale renewable energy deployment, including recognition at COP28 and the SolarPACES 2024 Technology Innovation Award. It is one of the world's largest single-site CSP projects and the largest CSP-PV hybrid facility globally.

7. Project Performance Snapshot

MetricResult
Delivery Performance100% On-Time
DocumentationComplete
Site AcceptancePassed
Project InaugurationDecember 2023
Major Systems COD2024
Project StatusCompleted
Operational StatusIn Service

8. Why Tiankang

  • ✔ Experience supporting major Chinese EPC contractors in overseas energy projects, including power generation, renewable energy and industrial facilities

  • ✔ Complete EPC Instrumentation Package Capability — from individual instruments to full package supply

  • ✔ High-temperature application expertise — instruments for molten salt thermal storage up to 565°C

  • ✔ Integrated instrumentation and cable supply capability — instrumentation, industrial cables and related accessories from one manufacturer

  • ✔ 30+ Years instrumentation manufacturing experience

  • ✔ Engineering Documentation Support — customized datasheets, inspection documents, and export documentation for EPC projects

  • ✔ Factory Calibration & Inspection — before shipment

  • ✔ Quality & Compliance Support — ISO 9001 manufacturing system and applicable product certifications for international EPC projects

9. Looking for an EPC Instrumentation Package Partner?

Whether you are bidding for a concentrated solar power project, photovoltaic plant, or renewable energy facility, our engineering team can help you prepare a complete instrumentation package based on your P&ID, instrument list, datasheets, and project specifications.

We support EPC contractors, system integrators, and industrial project owners worldwide with complete instrumentation packages from engineering selection, quotation support, documentation preparation to final delivery.

We provide complete solutions for:

  • ✔ Concentrated Solar Power Plants (CSP) — Tower & Trough

  • ✔ Photovoltaic Power Plants (PV)

  • ✔ Thermal Energy Storage Systems

  • ✔ Power Plants (CCGT, Thermal, Biomass)

  • ✔ Oil & Gas Refineries and Petrochemicals

  • ✔ Large-Scale Tank Farm and Pipeline Projects

Contact Our Engineering Team

Yin Shuangjie
International Sales Manager
📧 Email: [email protected]
📱 WhatsApp / Zalo: +86 17856068126
🌐 Website: www.tiankang-global.com

Send us your P&ID, instrument list or project specification. Our engineering team can assist with instrument selection, technical compliance and EPC package quotation.

We are ready to assist you with:

  • ✅ Instrument selection based on process conditions, P&ID, instrument list, and project specifications

  • ✅ Engineering support for high-temperature and renewable energy applications, material selection, and connection types

  • ✅ Complete instrumentation package design and configuration

  • ✅ EPC technical documentation and compliance support

  • ✅ Fast engineering response — typical quotation turnaround within 24–48 hours


This case study is based on publicly available project information and Anhui Tiankang's supply records, and is provided for reference purposes only.