Turkey Duzce Cam 300t/d Photovoltaic Glass Production Line Instrumentation Package

Turkey Duzce Cam 300t/d Photovoltaic Glass Production Line Instrumentation Package

Anhui Tiankang supplied thermocouples, RTDs and instrumentation accessories for the Turkey Duzce Cam 300t/d photovoltaic glass production line EPC project. Supporting high-temperature furnace monitoring with complete EPC documentation.
Message

High-Temperature Thermocouples & RTDs for Glass Melting Furnace Applications

Anhui Tiankang supplied thermocouples, RTDs and instrumentation accessories for the Turkey Duzce Cam 300t/d photovoltaic glass production line EPC project, supporting high-temperature furnace monitoring and process instrumentation requirements with engineered supply and complete EPC documentation.

Project Facts

ItemDetails
ProjectTurkey Duzce Cam 300t/d Photovoltaic Glass Production Line
Project TypePhotovoltaic Glass Production Line (EPC)
CountryTurkey
Project LocationDuzce, Turkey
Project OwnerDuzce Cam Glass Company (one of Turkey's leading flat glass manufacturers)
EPC ContractorChina Triumph International Engineering Co., Ltd. (CTIEC)
ApplicationGlass Melting Furnace, Conditioning Section & Annealing Lehr Instrumentation
Production Capacity300 tons/day photovoltaic glass; sufficient for 4GW of PV modules annually
Furnace TemperatureExceeding 1,500°C during glass melting operation
IndustryGlass Manufacturing / Photovoltaic / Building Materials
Scope of SupplyInstrumentation Package (Thermocouples, RTDs, Accessories)
Supply ValueRMB 380,000
Supply DateMarch 2022
Project StatusCompleted (Furnace Ignition Achieved)
DocumentationDatasheets / Calibration Certificates / MTC

Project Challenges

  • Extreme high-temperature furnace environment — glass melting furnaces operate at temperatures exceeding 1,500°C, requiring thermocouples with exceptional heat resistance and long-term stability

  • Corrosive atmosphere — instrumentation exposed to aggressive chemical conditions from glass batch materials and combustion by-products

  • Continuous furnace campaign operation — glass melting furnaces typically operate continuously for extended periods, requiring long-term measurement stability and minimal maintenance

  • Strict EPC documentation requirements — complete calibration certificates, material test certificates, and technical datasheets required for each instrument

  • Dual earthquake challenges — project experienced two major earthquakes (6.1 magnitude on November 23, 2022, and 7.8 magnitude on February 6, 2023) during construction, demanding resilient project coordination

Project Keywords

  • Industry: Glass Manufacturing, Photovoltaic, Building Materials

  • Country: Turkey

  • Application: Glass Melting Furnace, Conditioning Section, Annealing Lehr, Photovoltaic Glass Production

  • Product: Instrumentation Package, Thermocouple, RTD, High-Temperature Thermocouple, Furnace Thermocouple, Industrial RTD, Mineral Insulated Thermocouple, Thermocouple Assembly, Protection Tube, Industrial Temperature Sensor, Process Temperature Instrumentation

  • Client Type: EPC Contractor

Scope of Supply

  • Thermocouples (high-temperature types for glass melting furnace temperature monitoring)

  • RTDs (for conditioning section and annealing lehr temperature measurement)

  • Instrument accessories related to installation and connection

  • Calibration Documentation (certificates for all instruments)

  • Material Test Certificates (MTCs)

Supply completed in accordance with EPC project schedule requirements.

1. Project Overview

Anhui Tiankang Group served as the instrumentation package supplier for the Turkey Duzce Cam 300t/d photovoltaic glass production line EPC project, delivering thermocouples, RTDs, and instrumentation accessories in March 2022. Anhui Tiankang acted as a sub-supplier to the EPC contractor, providing engineered instrumentation supply and EPC documentation support. The supplied instrumentation supports reliable temperature measurement throughout the glass melting furnace, conditioning section, and annealing lehr, providing critical data for stable glass production and quality control.

The project, located in Duzce, Turkey, is owned by Duzce Cam Glass Company, one of Turkey's leading flat glass manufacturers. The EPC contract was signed with China Triumph International Engineering Co., Ltd. (CTIEC), a subsidiary of China National Building Material Group (CNBM). The project is the first photovoltaic glass production line built by a Chinese EPC contractor in Turkey and was the largest such line in the country at the time of construction. It was built entirely using Chinese standards, technology, and equipment.

The project withstood extraordinary challenges during construction: the COVID-19 pandemic, a 6.1 magnitude earthquake on November 23, 2022, and a 7.8 magnitude earthquake on February 6, 2023. Despite these obstacles, the production line successfully achieved ignition on June 25, 2024, and entered the commissioning and acceptance phase in mid-July 2024.

2. Scope of Supply

Anhui Tiankang Group's instrumentation supply for this project included:

Temperature Instruments

  • Thermocouples for high-temperature measurement in the glass melting furnace (exceeding 1,500°C operating conditions)

  • RTDs for temperature monitoring in the conditioning section and annealing lehr

Accessories & Documentation

  • Instrument accessories related to installation and connection

  • Calibration certificates

  • Material test certificates (MTCs)

  • Datasheets and installation guides

3. Project Technology – Application Context

The following provides background on the project's process technology to help understand the instrumentation application environment.

3.1 Photovoltaic Glass Production Process

The production line manufactures photovoltaic glass with a melting capacity of 300 tons per day, sufficient to support 4GW of solar module production annually. The glass melting furnace operates at temperatures exceeding 1,500°C, requiring specialized high-temperature thermocouples capable of maintaining accuracy and stability under extreme conditions.

3.2 Complete Chinese Standards and Technology

This project was built entirely using Chinese standards, technology, and equipment. For Duzce Cam, whose previous two float glass lines had used exclusively European technology and equipment, this represented a significant shift in trust toward Chinese EPC capability. The project demonstrates the competitiveness of Chinese glass manufacturing technology in the European market.

3.3 Project Significance

The project's successful completion demonstrates the resilience of the project team and established a foundation for CTIEC's subsequent 800 t/d project in Turkey, which became the largest photovoltaic glass production line in Europe and Western Asia upon ignition on September 19, 2025. This project represents an important expansion of Chinese EPC capability in the European photovoltaic glass sector and serves as a reference for Chinese contractors entering this market.

4. Engineering Solution

Our selection and supply were based on CTIEC's specifications, process conditions, and site requirements.

Temperature Measurement – Furnace Application

Thermocouple assemblies were configured according to furnace measurement locations, considering operating temperature, process atmosphere, sensor insertion length, protection tube material, and installation requirements specified by the EPC contractor. Sensor designs were selected for long-term stability and reliability in continuous high-temperature service, minimizing the need for frequent replacement during the furnace campaign.

Temperature Measurement – Conditioning & Lehr Sections

RTDs were supplied with appropriate sheath materials, insertion lengths, process connections, and measuring ranges according to the temperature control requirements of the conditioning section and annealing lehr.

Documentation & Quality Control

All instruments were delivered with complete calibration certificates, material test certificates (MTCs), and technical datasheets, ensuring full traceability and compliance with project requirements.

5. Project Execution

Execution followed the EPC contractor's project schedule and quality requirements. Anhui Tiankang Group established dedicated coordination to ensure alignment between supply and site installation.

  • On-Time Delivery: All instrumentation packages were delivered in March 2022, meeting the EPC contractor's site installation schedule.

  • Quality Assurance: Instruments supplied with complete calibration certificates, MTCs, and technical documentation.

  • Documentation Package: Datasheets, calibration reports, and quality certificates accompanied all shipments.

  • Technical Support: Provided responsive consultation throughout the supply process.

6. Project Outcome

The Turkey Duzce Cam 300t/d photovoltaic glass production line successfully achieved ignition on June 25, 2024, and entered the commissioning and acceptance phase in mid-July 2024.

Key Results:

  • ✓ 100% of instrumentation delivered on schedule

  • ✓ Supplied instruments successfully completed site acceptance requirements

  • ✓ Complete documentation package provided

  • ✓ Project successfully achieved furnace ignition and entered commissioning phase

  • ✓ Project withstood dual major earthquakes and pandemic challenges

Project Milestones

MilestoneDate
EPC Contract SignedJuly 25, 2018
EPC Contract Re-Signed (Post-COVID)November 6, 2020
6.1 Magnitude EarthquakeNovember 23, 2022
7.8 Magnitude EarthquakeFebruary 6, 2023
Furnace IgnitionJune 25, 2024
Commissioning PhaseJuly 2024

The project's successful completion, despite two major earthquakes and the COVID-19 pandemic, demonstrates the resilience and capability of the project team. It established a foundation for CTIEC's subsequent 800 t/d project in Turkey, which became the largest photovoltaic glass production line in Europe and Western Asia upon ignition on September 19, 2025.

7. Project Performance Snapshot

MetricResult
Delivery Performance100% On-Time
DocumentationComplete
Site AcceptancePassed
Furnace IgnitionJune 25, 2024
CommissioningJuly 2024
Project StatusCompleted
Operational StatusIn Service

8. Why Tiankang

  • ✔ 30+ Years instrumentation manufacturing experience

  • ✔ In-house manufacturing capability for temperature instruments

  • ✔ High-temperature measurement expertise — thermocouples, RTDs, thermowells, and protection tubes for demanding furnace applications

  • ✔ Complete EPC Instrumentation Package Capability — from individual sensors to full package supply

  • ✔ Engineering Documentation Support — customized datasheets, inspection documents, and export documentation for EPC projects

  • ✔ Factory Calibration & Inspection — before shipment

  • ✔ Global EPC Project Experience — proven track record across glass manufacturing, power generation, and industrial sectors

  • ✔ Quality & Compliance Support — ISO 9001 manufacturing system and applicable product certifications for international EPC projects

9. Looking for an EPC Instrumentation Package Partner?

Whether you are bidding for a new glass manufacturing project or upgrading an existing production line, our engineering team can assist with instrumentation selection, package supply, and EPC documentation support.

We support EPC contractors with complete instrumentation packages from engineering selection, quotation support, documentation preparation to final delivery.

We provide complete solutions for:

  • ✔ Glass Manufacturing Plants (Float Glass, Photovoltaic Glass)

  • ✔ Cement Plants and WHR Projects

  • ✔ Power Plants (CCGT, Thermal, Biomass)

  • ✔ Pulp & Paper Mills

  • ✔ Oil & Gas Refineries and Petrochemicals

  • ✔ Large-Scale Tank Farm and Pipeline Projects

Contact Our Engineering Team

Yin Shuangjie
International Sales Manager
📧 Email: [email protected]
📱 WhatsApp / Zalo: +86 17856068126
🌐 Website: www.tiankang-global.com

We are ready to assist you with:

  • ✅ Instrument selection based on process conditions, P&ID, instrument list, and project specifications

  • ✅ Engineering support for high-temperature applications, material selection, and connection types

  • ✅ Complete instrumentation package design and configuration

  • ✅ EPC technical documentation and compliance support

  • ✅ Fast engineering response — typical quotation turnaround within 24–48 hours


This case study is based on publicly available project information and Anhui Tiankang's supply records, and is provided for reference purposes only.