Turkey Modern Karton PM6 Paperboard Mill Instrumentation Package

Turkey Modern Karton PM6 Paperboard Mill Instrumentation Package

Anhui Tiankang supplied pressure gauges, industrial thermometers and instrumentation accessories for the Turkey Modern Karton PM6 paperboard mill EPC project. Supporting steam system monitoring and process instrumentation with complete EPC documentation.
Message

Pressure Gauges & Industrial Thermometers for Steam System Applications

Anhui Tiankang supplied pressure gauges, industrial thermometers and instrumentation accessories for the Turkey Modern Karton PM6 paperboard mill EPC project, supporting steam system monitoring and process instrumentation requirements with engineered supply and complete EPC documentation.

Project Facts

ItemDetails
ProjectTurkey Modern Karton PM6 Paperboard Mill Project
Project TypePaperboard Mill (EPC)
CountryTurkey
Project LocationZonguldak, Turkey
Project OwnerModern Karton (Eren Holding Group)
EPC ContractorHarbin Electric International Company Limited (HEI)
ApplicationSteam System, Pulping Process & Wastewater Treatment Instrumentation
Annual Production CapacityApprox. 640,000–700,000 tons/year recycled containerboard capacity
Paper MachineVoith XcelLine PM6, 8.5m width, 2,000 m/min design speed
Wastewater Treatment20,160 m³/day capacity
IndustryPulp & Paper / Paperboard Manufacturing
Scope of SupplyInstrumentation Package (Pressure Gauges, Industrial Thermometers, Accessories)
Supply ValueApprox. RMB 10.19 million (Instrumentation Package)
Supply DateOctober 2022
Project StatusCompleted (Commercial Operation Achieved)
DocumentationDatasheets / Calibration Certificates / MTC

Project Challenges

  • Complex steam distribution network — the mill includes multiple steam systems serving paper machine drying, pulping, chemical, wastewater, and utility sections across five principal pipeline branches

  • High-temperature, high-pressure steam service — instrumentation must withstand demanding conditions across the paper machine drying section and steam systems

  • Continuous 24/7 production operation — instruments require reliable operation and stable measurement performance during continuous production

  • Strict EPC documentation requirements — complete calibration certificates, material test certificates, and technical datasheets required for each instrument

  • Large-scale EPC project coordination — supply aligned with HEI's construction schedule, coordinating with multiple stakeholders including Voith and CEC

Project Keywords

  • Industry: Pulp & Paper, Paperboard Manufacturing

  • Country: Turkey

  • Application: Steam System, Pulping Process, Wastewater Treatment, Paperboard Mill

  • Product: Instrumentation Package, Pressure Gauge, Industrial Thermometer, Dial Thermometer, Process Instrumentation, Steam System Instrumentation, Paper Mill Instrumentation

  • Client Type: EPC Contractor

Scope of Supply

  • Pressure Gauges (stainless steel, various ranges for steam and process systems)

  • Industrial Thermometers (dial thermometers, various ranges and insertion lengths for temperature monitoring)

  • Instrument accessories related to installation and connection

  • Calibration Documentation (certificates for all instruments)

  • Material Test Certificates (MTCs)

Supply completed in accordance with EPC project schedule requirements.

1. Project Overview

Anhui Tiankang Group served as the instrumentation package supplier for the Turkey Modern Karton PM6 Paperboard Mill EPC project, delivering pressure gauges, industrial thermometers, and instrumentation accessories in October 2022. Anhui Tiankang acted as a sub-supplier to the EPC contractor, providing engineered instrumentation supply and EPC documentation support. The supplied instrumentation supports reliable pressure and temperature measurement throughout the steam systems, pulping process, and wastewater treatment facilities, providing critical data for safe and efficient paper production.

The project, located in Zonguldak, Turkey, is owned by Modern Karton, a subsidiary of Eren Holding and one of Turkey's largest packaging paper producers. The EPC contract was formally signed on October 22, 2021, between HEI and Eren Holding. The production line integrates a high-speed paper machine with an 8.5-meter width and 2,000 m/min design speed, designed for an annual production capacity of approximately 640,000–700,000 tons.

The project successfully achieved pulp feeding and start-up on August 15, 2025, produced its first reel of containerboard on August 28, 2025, and reached full commercial operation in Q4 2025.

2. Scope of Supply

Anhui Tiankang Group's instrumentation supply for this project included:

Pressure Instruments

  • Stainless steel pressure gauges for steam system pressure monitoring across five principal steam pipeline branches

Temperature Instruments

  • Industrial thermometers (dial thermometers) for temperature measurement in steam systems, pulping process, and wastewater treatment

Accessories & Documentation

  • Instrument accessories related to installation and connection

  • Calibration certificates

  • Material test certificates (MTCs)

  • Datasheets and installation guides

3. Project Technology – Application Context

The following provides background on the project's process technology to help understand the instrumentation application environment.

3.1 Paper Machine & Steam System

The production line integrates a high-speed paper machine with an 8.5-meter width and 2,000 m/min design speed, producing 70-100 gsm containerboard and corrugated base paper. The paper machine drying section and auxiliary steam systems rely on a complex steam distribution network segmented into five principal pipeline branches: external pipe rack, wastewater, chemical, paper machine workshop, and pulping workshop steam systems. Reliable steam pressure and temperature monitoring is essential for maintaining stable drying performance and production efficiency.

3.2 Wastewater Treatment

The plant includes a wastewater treatment facility with a daily processing capacity of 20,160 cubic meters, supporting the mill's environmental compliance and sustainability goals.

3.3 Project Significance

This project represents an important expansion of HEI's EPC capability into the light industrial papermaking sector and serves as a reference for Chinese EPC contractors entering non-power business domains.

4. Engineering Solution

Our selection and supply were based on HEI's specifications, process conditions, and site requirements.

Pressure Measurement

Pressure gauge materials and pressure ratings were selected according to steam system requirements, process conditions, and EPC specifications. Stainless steel pressure gauge cases and pressure-containing components were selected according to process requirements and steam service conditions across the paper mill's five principal steam branches.

Temperature Measurement

Industrial thermometers were selected with appropriate measuring ranges, dial sizes, insertion lengths, and connection types according to HEI's specifications and the specific requirements of each steam system location. Thermometer designs were configured for the demanding paper mill environment, including consideration of vibration, installation conditions, and continuous operation.

Documentation & Quality Control

All instruments were delivered with complete calibration certificates, material test certificates (MTCs), and technical datasheets, ensuring full traceability and compliance with project requirements.

5. Project Execution

Execution followed the EPC contractor's project schedule and quality requirements. Anhui Tiankang Group established dedicated coordination to ensure alignment between supply and site installation.

  • On-Time Delivery: All instrumentation packages were delivered in October 2022, meeting the EPC contractor's site installation schedule.

  • Quality Assurance: Instruments supplied with complete calibration certificates, MTCs, and technical documentation.

  • Documentation Package: Datasheets, calibration reports, and quality certificates accompanied all shipments.

  • Technical Support: Provided responsive consultation throughout the supply process.

6. Project Outcome

The Turkey Modern Karton PM6 Paperboard Mill Project achieved pulp feeding and start-up on August 15, 2025, produced its first reel of containerboard on August 28, 2025, and reached full commercial operation in Q4 2025.

Key Results:

  • ✓ 100% of instrumentation delivered on schedule

  • ✓ Supplied instruments successfully completed site acceptance requirements

  • ✓ Complete documentation package provided

  • ✓ Project successfully achieved commercial operation

Project Milestones

MilestoneDate
EPC Contract SignedOctober 22, 2021
Main Equipment InstalledDecember 2023
Main Steam Purging CompletedApril 2025
Start-Up (Pulp Feeding)August 15, 2025
First Reel ProducedAugust 28, 2025
Commercial OperationQ4 2025

HEI's Project Manager, Xu Tie, stated: "It was the first processing project in the paper industry, and we are proud of this achievement in collaboration with Voith and Modern Karton."

7. Project Performance Snapshot

MetricResult
Delivery Performance100% On-Time
DocumentationComplete
Site AcceptancePassed
Start-UpAugust 15, 2025
First ReelAugust 28, 2025
Commercial OperationQ4 2025
Project StatusCompleted
Operational StatusIn Service

8. Why Tiankang

  • ✔ 30+ Years instrumentation manufacturing experience

  • ✔ In-house manufacturing capability for pressure and temperature instruments

  • ✔ Integrated Industrial Manufacturing Capability — instrumentation, industrial cables and related products from one supplier

  • ✔ Complete EPC Instrumentation Package Capability — from individual instruments to full package supply

  • ✔ Engineering Documentation Support — customized datasheets, inspection documents, and export documentation for EPC projects

  • ✔ Factory Calibration & Inspection — before shipment

  • ✔ Global EPC Project Experience — proven track record across power generation, pulp & paper, and industrial sectors

  • ✔ Quality & Compliance Support — ISO 9001 manufacturing system and applicable product certifications for international EPC projects

9. Looking for an EPC Instrumentation Package Partner?

Whether you are bidding for a pulp & paper project, power plant, or industrial utility system, our engineering team can help you prepare a complete instrumentation package based on your P&ID, instrument list, datasheets, and project specifications.

We support EPC contractors with complete instrumentation packages from engineering selection, quotation support, documentation preparation to final delivery.

We provide complete solutions for:

  • ✔ Pulp & Paper Mills

  • ✔ Industrial Steam Systems

  • ✔ Power Plants (CCGT, Thermal, Biomass)

  • ✔ Cement Waste Heat Recovery (WHR)

  • ✔ Oil & Gas Refineries and Petrochemicals

  • ✔ Large-Scale Tank Farm and Pipeline Projects

Contact Our Engineering Team

Yin Shuangjie
International Sales Manager
📧 Email: [email protected]
📱 WhatsApp / Zalo: +86 17856068126
🌐 Website: www.tiankang-global.com

We are ready to assist you with:

  • ✅ Instrument selection based on process conditions, P&ID, instrument list, and project specifications

  • ✅ Engineering support for material selection, pressure class, and connection types

  • ✅ Complete instrumentation package design and configuration

  • ✅ EPC technical documentation and compliance support

  • ✅ Fast engineering response — typical quotation turnaround within 24–48 hours


This case study is based on publicly available project information and Anhui Tiankang's supply records, and is provided for reference purposes only.


Contact

  • 看不清楚?换张图片